Waubonsee Community College

Sustaining U.S. nuclear submarine design capabilities, John F. Schank [and others]

Label
Sustaining U.S. nuclear submarine design capabilities, John F. Schank [and others]
Language
eng
Bibliography note
Includes bibliographical references (pages 199-201)
Illustrations
illustrations
Index
no index present
Literary Form
non fiction
Main title
Sustaining U.S. nuclear submarine design capabilities
Nature of contents
dictionariesbibliography
Oclc number
184844256
Responsibility statement
John F. Schank [and others]
Summary
For the first time since the design of the first nuclear submarine, the U.S. Navy has no nuclear submarine design program under way, which raises the possibility that design capability could be lost. Such a loss could result in higher costs and delays when the next submarine design is undertaken, as well as risks to system performance and safety. The authors estimate and compare the costs and delays of letting design capability erode vs. those of alternative means of managing the workload and workforce over the gap in design demand and beyond. The authors recommend that the Navy consider stret
Table Of Contents
Cover; Preface; Contents; Figures; Tables; Summary; Acknowledgments; Abbreviations; Chapter One -- Introduction; Chapter Two -- The Submarine Design Process; Chapter Three -- Framing the Analysis; Chapter Four -- Effect of Different Options for Managing Design Resources; Chapter Five -- Critical Skills; Chapter Six -- Suppliers; Chapter Seven -- The Navy's Roles and Responsibilities in Submarine Design; Chapter Eight -- Effect of a Design Gap on the Navy's Technical Community; Chapter Nine -- Conclusions and Recommendations; Appendix A; Appendix B; Appendix C; Appendix D; Appendix E; Bibliography
Classification
Content
Mapped to